400-010-3808
CN EN

Collect us

Sichuan Kelun Medical Trade Automation Logistics Center

Video Player is loading.
Current Time 0:00
/
Duration 0:00
Loaded: 0%
0:00
Progress: 0%
Stream Type LIVE
Remaining Time -0:00
 
1x

The total investment amount of the Sichuan Kelun Commercial Automation Logistics Center project is 120 million yuan, making it the largest single building pharmaceutical logistics center in China and the largest investment in automated logistics equipment. The Kelun Medical Trade Headquarters and Warehouse Logistics Base project is located in Chengdu. The overall plan covers an area of about 150 acres, with a planned construction area of 80000 square meters for the warehousing and logistics base. It stores over 800000 pieces of goods and has an average daily throughput of 130000 pieces, supporting the headquarters' annual sales scale of about 20 billion yuan.



The equipment invested in this project includes AS/RS system, multi-layer shuttle system, Miniload system, box sorting system, tray conveyor line system, 

tray elevator system, electronic label system, automatic sorting system, etc.


1) AS/RS system: There are a total of 12 pallet stackers with single extension positions and 1 with double extension positions, with a total of 25536 pallet 

positions;


2) Multi layer shuttle car system: a total of 6 lanes, with 13 layers and 78 multi pass cars. The number of cargo spaces is 31200 boxes; There are a total of 6 

goods to person picking workstations;


3) Miniload system: a total of 5 lanes, 34 floors, with a height of about 20 meters, and a total of 54400 container cargo spaces;


4) Automatic sorting system: slider sorting machine, with a total of 26 downhill lanes.


Software Center

Go immediately >

After-Sale Service

Go immediately >

Industry Solutions

Go immediately >

Contact

sales@vstrong.com

Online service

Service hotline

400-010-3808

TOP